scription="">
Detailed Product Descript ion
KQ/GDT150 Toffee Candy Production Line
High quality,SIEMENS
Competitive price
Full before/after-sale services
CE approved
TECHNICALSPECIFICATIONS:
Model
KQ/GDT 150
Configuration
Production capacity ( kg/h)
150kg/h
PLC
Taiwan
Rated depositing times(n/min)
25~35
Frequency Invertor
Taiwan
Weight of each candies(g):
5g~12g
Touch Screen
Taiwan
Electric power needed
220V 50HZ
Electronic Part
Siemens
Total Power
18kw
Conditions needed for the cooling system:
1.Room temperature(°C)
2. Humidity (%)
20~25
55
Pneumatic Cylinder
Taiwan
Motor
China
Length of the whole line (m)
18m
FLOW DIAGRAM:
Toffee mass preparation: sugar dissolving → mixing → homogenizing → vacuum cooking → depositing → cooling →de-moulding→ packaging
Machine Samples
OTHERS:
DELIVERY DATE: Within 60 days upon the receipt of the down payment.
DELIVERY: FOB Shanghai
TERMS OF PAYMENT: Before shipping, the seller should test running the machines for buyer’s inspection and do the shipping after all parts are inspected and accepted by the buyer, 30% should be paid by T/T as the deposit, 65% should be paid by T/T before shipping, 5% will be paid by T/T after installation.
NOTES: The quotation information just for customers to reference, Due to the company’s policy of continuous improvement, KU@QI has the right reserved to make technical modifications without prior notice.
Testing & training: The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging, and US$50.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
Utilities: The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
WARRANTY: The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery; the seller will replace the parts or send the technicians to go to the buyer’s site for repairing and maintenance at FREE. If the defaults are aroused by the defaulted operations of the buyer, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
VALIDITY: This offer is valid 30 days.
In case there are any questions concerning this quotation, please do not hesitate to contact undersigned.
Thanks & Best regards!
scription="">
Detailed Product Descript ion
KQ/GDT150 Toffee Candy Production Line
High quality,SIEMENS
Competitive price
Full before/after-sale services
CE approved
TECHNICALSPECIFICATIONS:
Model
KQ/GDT 150
Configuration
Production capacity ( kg/h)
150kg/h
PLC
Taiwan
Rated depositing times(n/min)
25~35
Frequency Invertor
Taiwan
Weight of each candies(g):
5g~12g
Touch Screen
Taiwan
Electric power needed
220V 50HZ
Electronic Part
Siemens
Total Power
18kw
Conditions needed for the cooling system:
1.Room temperature(°C)
2. Humidity (%)
20~25
55
Pneumatic Cylinder
Taiwan
Motor
China
Length of the whole line (m)
18m
FLOW DIAGRAM:
Toffee mass preparation: sugar dissolving → mixing → homogenizing → vacuum cooking → depositing → cooling →de-moulding→ packaging
Machine Samples
OTHERS:
DELIVERY DATE: Within 60 days upon the receipt of the down payment.
DELIVERY: FOB Shanghai
TERMS OF PAYMENT: Before shipping, the seller should test running the machines for buyer’s inspection and do the shipping after all parts are inspected and accepted by the buyer, 30% should be paid by T/T as the deposit, 65% should be paid by T/T before shipping, 5% will be paid by T/T after installation.
NOTES: The quotation information just for customers to reference, Due to the company’s policy of continuous improvement, KU@QI has the right reserved to make technical modifications without prior notice.
Testing & training: The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging, and US$50.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
Utilities: The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
WARRANTY: The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery; the seller will replace the parts or send the technicians to go to the buyer’s site for repairing and maintenance at FREE. If the defaults are aroused by the defaulted operations of the buyer, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
VALIDITY: This offer is valid 30 days.
In case there are any questions concerning this quotation, please do not hesitate to contact undersigned.
Thanks & Best regards!
Detailed Product Descript ion
KQ/GDT150 Toffee Candy Production Line
High quality,SIEMENS
Competitive price
Full before/after-sale services
CE approved
TECHNICALSPECIFICATIONS:
Model |
KQ/GDT 150 |
Configuration |
||
Production capacity ( kg/h) |
150kg/h |
PLC |
Taiwan |
|
Rated depositing times(n/min) |
25~35 |
Frequency Invertor |
Taiwan |
|
Weight of each candies(g): |
5g~12g |
Touch Screen |
Taiwan |
|
Electric power needed |
220V 50HZ |
Electronic Part |
Siemens |
|
Total Power |
18kw |
|||
Conditions needed for the cooling system: 1.Room temperature(°C) 2. Humidity (%) |
20~25 55 |
Pneumatic Cylinder |
Taiwan |
|
Motor |
China |
|||
Length of the whole line (m) |
18m |
FLOW DIAGRAM:
Toffee mass preparation: sugar dissolving → mixing → homogenizing → vacuum cooking → depositing → cooling →de-moulding→ packaging
Machine Samples
OTHERS:
DELIVERY DATE: Within 60 days upon the receipt of the down payment.
DELIVERY: FOB Shanghai
TERMS OF PAYMENT: Before shipping, the seller should test running the machines for buyer’s inspection and do the shipping after all parts are inspected and accepted by the buyer, 30% should be paid by T/T as the deposit, 65% should be paid by T/T before shipping, 5% will be paid by T/T after installation.
NOTES: The quotation information just for customers to reference, Due to the company’s policy of continuous improvement, KU@QI has the right reserved to make technical modifications without prior notice.
Testing & training: The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging, and US$50.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
Utilities: The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
WARRANTY: The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery; the seller will replace the parts or send the technicians to go to the buyer’s site for repairing and maintenance at FREE. If the defaults are aroused by the defaulted operations of the buyer, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
VALIDITY: This offer is valid 30 days.
In case there are any questions concerning this quotation, please do not hesitate to contact undersigned.
Thanks & Best regards!
For more useful information, please feel free to contact with me.
email:hflzhs@hotmail.com
skype:hflzhs
mobile phone:86-18930197459